Inspection 4~Ezaviel~11/09/2015
From Australis Ultima 30k
Inspection Details Status: In Progress
| |
---|---|
Created By: |
|
Created On: |
11/09/2015 |
Entered Into: |
Inspection 4 |
Brother Zeruel, Centurion of the I Legion.